Starting point
Standard energy supplierA rate per kWh, based on an average consumption profile.
COMCAM Portfolio Management & CSPYour own quarter-hour data as the basis (Energy Intelligence), before any procurement form is advised.
Contract-form advice
Standard energy supplierA dynamic contract as "the modern choice", regardless of whether you can steer load.
COMCAM Portfolio Management & CSPProcurement form based on what your load can genuinely shift - for RAS, almost nothing, so price certainty comes first.
Grid capacity (GTV)
Standard energy supplierArranged once at connection, with no ongoing check after that.
COMCAM Portfolio Management & CSPContracted capacity tested continuously against your actual peak and against electrification plans - right-sized before an expansion, rather than after a refusal.
Standing with the netbeheerder
Standard energy supplierNone. A supplier sells kWh. Your connection, your transport capacity and your place in the queue sit with the netbeheerder - a party a supplier has no relationship with.
COMCAM Portfolio Management & CSPCOMCAM works on that side of the meter too: the transportverzoek, the congestion research published for your area, and what the capacity map means at your own grid level.
When capacity is refused
Standard energy supplierOutside their scope. The answer is a different tariff, not a route to capacity.
COMCAM Portfolio Management & CSPEvery route is weighed: a non-firm or time-bound transport right, a capaciteitsbeperkingscontract, cable pooling, an energy hub, behind-the-meter generation, or storage sized to the peak that blocks your connection. For life-support systems the first two usually fail - they trade certainty for speed, and that is the one thing you cannot trade.
Congestion markets
Standard energy supplierNot a role a supplier holds. Congestion products are contracted with the grid operator, not with your supplier.
COMCAM Portfolio Management & CSPAs a Congestion Service Provider recognised by TenneT, COMCAM can place genuinely non-critical capacity - a battery, a thermal buffer, backup plant - in redispatch via GOPACS or a capacity limitation contract. On a RAS site that slice is small; pumping and aeration are never in it.
Monitoring & risk
Standard energy supplierOne invoice a month, no quarter-hour level, and a conversation when the contract term ends.
COMCAM Portfolio Management & CSPQuarter-hour data across all connections, traceable to the source data, with budget and capacity risk flagged while there is still time to act.
Continuity & LSS
Standard energy supplierNo visibility into what an outage means for your life-support systems.
COMCAM Portfolio Management & CSPBackup provision and standby capacity built into the position, not a separate checklist item.