Cable pooling
Grid capacity & congestion

Cable pooling

Cable pooling places the installations of up to four parties behind one connection to the public grid. Under the Energiewet this is no longer limited to wind and solar: storage, buildings and charging infrastructure can share the connection too. The parties behave as one connected party under one connection and transport agreement, their installations must sit in each other's direct vicinity with no other grid connection, and they are themselves responsible for staying within the shared contracted capacity.

What pooling actually requires

Four parties, one connection, one agreement

Below is an illustrative year of four parties sharing one connection to the public grid, each using part of the same limit. Under the Energiewet they are not limited to wind and solar, and they carry the limit together.

Illustrative example, not a real client report
The situation

Picture four installations behind a single connection: a wind turbine, a solar field, a battery and a charging hub. To the grid operator they are one connected party under one connection and transport agreement, and keeping the combined load inside the shared capacity is their own responsibility rather than the grid operator's.

Parties on the connection4 of max. 4
Connection and transport agreements1
Busiest combined month84% of shared limit
Other grid connections allowedNone
0255075100% of shared limitJanMarMayJulSepNovAB
WindSolarStorageCharging
A

The mix shifts, the limit does not

Wind carries January and solar carries July, but the ceiling the four share stays the same all year. That is what makes one connection enough for four.

B

Staying inside it is on the parties

No grid operator caps this for them. The four agree a mechanism between themselves, or the values in the shared agreement get exceeded.

Shares are illustrative, built to show the method. They are not a real installation's output, and the shared limit is deliberately shown as a share rather than a capacity figure.
How we approach it

From question to execution

  1. 01

    We analyse the production profiles of both installations.

  2. 02

    We calculate the shared connection size and the expected curtailment.

  3. 03

    We arrange the agreements with the grid operator and between the parties.

  4. 04

    We steer production so the connection stays within its limit.

What it yields

This is what changes for you

  • A second installation without a second connection
  • Far better use of the capacity you have
  • Curtailment kept to a minimum through steering

One partner for everything around your energy

We calculate, arrange and execute: procurement on the exchanges, steering of your assets, grid capacity, sustainability and subsidies. Independent, not a supplier, not a comparison site. A conversation is free of obligation.

See all solutions
Available for new projects

Let's shape your energy future

Whether you're navigating market volatility, optimising your portfolio, or exploring sustainable solutions - we're here to help.

Usually a response within one working day
35,000+ connections managed
6 European offices